| HOME : Case Studies : Bombardier Aerospace
| |
Bombardier Aerospace (Shorts) | What do you do when you need to pick up ¾Tonne of a half assembled tail wing from an executive jet, rotate through several positions during the assembly stages, then precisely position it on a special shipment rig, whilst evenly distributing the load to prevent crushing of the wing? This was the problem Bombardier Aerospace encountered before calling in Street CraneXpress Ltd to find a solution. | If you would like to read more about the design and construction and view the picture gallery of our work at the Royal Opera House, please register / login with our members area. |
|